Projects
SECURITY UPGRADES
Supply/installation of high-security film
CANADIAN EMBASSY
SAUDI ARABIA
Global Affairs Canada
Infrasecure was tasked with the removal of old window film and the installation of new, blast-resistant film on several of the staff residences at the Embassy.
SECURITY UPGRADES AND ADDITIONS
Development and construction
NETHERLANDS EMBASSY
BURKINA FASO
Kingdom of the Netherlands
Infrasecure worked with the Embassy to renovate the facility and add an area of refuge with ballistic glass, as well as a new controlled entrance.
SECURITY UPGRADES AND ADDITIONS
Development and construction
CANADIAN EMBASSY
BURKINA FASO
Global Affairs Canada
Infrasecure was responsible for the construction of a 160 foot long by 12 foot high perimeter wall, renovations to the existing guard hut, two sally ports, an automatic gate, and an interior renovation to create an area of refuge.
SECURITY UPGRADES
Supply/Installation of High-security Bollards and Equipment
TUNIS
TUNISIA
Global Affairs Canada
Infrasecure was responsible for the installation of 150 crash-rated bollards around the perimeter of the Canadian Chancery in Tunis, as well as an anti-crash and blast gate, an automated pedestrian gate, CCTV equipment and security lighting.
RECAPITALIZATION AND EXPANSION
Construction Management
CANADIAN EMBASSY
SAUDI ARABIA
Global Affairs Canada
Infrasecure provided management for a mid-life recapitalization and expansion of the embassy and the Ambassador's official residence with a total project value of $14,000,000. This included construction services for the entire project and the implementation of building hardening design, while meeting Canadian standards. Through Global Affairs Canada (GAC), Infrasecure Group’s role was to provide construction management, administrative and technical support to a local general contractor with the remaining portion of their contract. Infrasecure also provided on-going support to implement project management tools and effective resource allocations.
SECURITY UPGRADES AND ADDITIONS
Development and construction
ADDIS ABABA
ETHIOPIA
Global Affairs Canada
Infrasecure upgraded the existing perimeter security, built a new guard house and mail sorting facility, and modified the secondary staff/services entry at the Canadian Embassy in Ethiopia.
CANADIAN DEFENCE FACILITY BLAST PROTECTION
Development, co-ordination and supervision
CANADA
Walsh Canada
Infrasecure co-ordinated the application of Dynasystems Polymer Armour to protect against possible threats happening to the exterior of the building due to a vehicle-borne improvised explosive device (VBIED), or inside the loading dock, vestibule and lobby due to a person-borne improvised explosive device (PBIED).
VEHICLE SCREENING FACILITY PROTECTIVE ENCLOSURE
Design and construction
PARLIAMENT HILL
OTTAWA
Public Works and Government Services Canada and the Royal Canadian Mounted Police
Infrasecure Group provided management and technical support in order to complete the construction of a protective enclosure for the West Block ECP (entry control point). The solution was provided by the installation of the Dynasystems Dynacell protective panel system, that ensures that only minimal damage would be sustained in the event of a blast, and the structure could be easily and quickly restored in both form and function to its pre-attack condition.
CITY HALL SECURITY ENHANCEMENTS
Installation of High-security Bollards
MARION DEWAR PLAZA
OTTAWA
City of Ottawa – Infrastructure Services Department
The City of Ottawa tapped Infrasecure to co-ordinate the installation of 46 high-security, K12/M50 crash-rated bollards. This combination of fixed, removable and retractable bollards will surround Marion Dewar Plaza, a popular gathering spot for events and activities.